General DevelopmentIC.CNST.PRMT.TM.DY
Dealing with construction permits: Time (days)
Official Definition & Methodology Note
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.
Registry Metadata
| Indicator Code | IC.CNST.PRMT.TM.DY |
|---|---|
| Primary Domain | General Development |
| Source Database | Doing Business |
| Compiling Organization | World Bank Open Data |
| Metadata Verified | 2026-11-26T16:30:20Z |
Related Indicators in General Development
IC.CNST.PRMT.RKRank: Dealing with construction permits (1=most business-friendly regulations)IC.CNST.PRMT.TM.DY.DFRNDealing with construction permits: Time (days) - ScoreIC.CNST.PRMT.QCDC.XD.03.DB1619Dealing with construction permits: Quality control during construction index (0-3) (DB16-…IC.CON.GIFT.ZSExpected to give gifts to get a Construction Permit (% of firms)IC.CNST.PRMT.QCBC.XD.01.DB1619Dealing with construction permits: Quality control before construction index (0-1) (DB16-…IC.CNST.PRMT.QCAC.XD.DB1619Dealing with construction permits: Quality control after construction index (0-3) (DB16-2…IC.CRD.LGL.XQGetting credit, legal rights indexIC.CNST.PRMT.QBR.XD.02.DB1619Dealing with construction permits: Quality of building regulations index (0-2) (DB16-20 m…