IndicatorRegistry.net
General DevelopmentIC.CNST.PRMT.QCAC.XD.DB1619

Dealing with construction permits: Quality control after construction index (0-3) (DB16-20 methodology)

Official Definition & Methodology Note

The quality control after construction index evaluates quality control after the construction process. It has two components: (i) whether a final inspection is mandated by law to verify that the building was built in accordance with the approved plans and existing building regulations; and (ii) whether the final inspection is implemented in practice. The index is computed based on the methodology in the DB16-20 studies.

Registry Metadata

Indicator CodeIC.CNST.PRMT.QCAC.XD.DB1619
Primary DomainGeneral Development
Source DatabaseDoing Business
Compiling OrganizationWorld Bank Open Data
Metadata Verified2026-11-26T16:30:20Z
Browse Indicator Codes A–Z