Energy & MiningIC.ELC.TIME
Time required to get electricity (days)
Official Definition & Methodology Note
Time required to get electricity is the number of days to obtain a permanent electricity connection. The measure captures the median duration that the electricity utility and experts indicate is necessary in practice, rather than required by law, to complete a procedure.
Registry Metadata
| Indicator Code | IC.ELC.TIME |
|---|---|
| Primary Domain | Energy & Mining |
| Source Database | WDI Database Archives |
| Compiling Organization | World Bank, Doing Business project (http://www.doingbusiness.org/). NOTE: Doing Business has been discontinued as of 9/16/2021. For more information: https://bit.ly/3CLCbme |
| Associated Topics | Energy & Mining · Private Sector |
| Metadata Verified | 2026-11-26T16:30:20Z |
Related Indicators in Energy & Mining
IC.ELC.DURSTime to obtain an electrical connection (days)IC.FRM.BNKS.ZSFirms using banks to finance investment (% of firms)IC.FRM.OUTG.ZSValue lost due to electrical outages (% of sales for affected firms)IE.PPI.ENGY.CDInvestment in energy with private participation (current US$)EP.PMP.SGAS.CDPump price for gasoline (US$ per liter)EP.PMP.DESL.CDPump price for diesel fuel (US$ per liter)EN.ATM.NOXE.EG.ZSNitrous oxide emissions in energy sector (% of total)EN.ATM.NOXE.EG.KT.CENitrous oxide emissions in energy sector (thousand metric tons of CO2 equivalent)